Slab pour finished

Height of the DEB is realistic now!

Garage on the lower left


Water tanks on the lower right


Front porch and agg line under the slab. Agg line is used to drain any water away that may build up friom the rear or underneath ( I suspect).

I will need to talk to the SS as where the agg line exits is where the stairs will go so not sure where/how it's drained from that point.